Close Menu
GeekBlog

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Stop falling for scams when Norton’s antivirus software is 70% off right now

    March 28, 2026

    Acer Promo Codes and Deals: Save 40% on Bundles

    March 28, 2026

    Playing Wolfenstein 3D with one hand in 2026

    March 28, 2026
    Facebook X (Twitter) Instagram Threads
    GeekBlog
    • Home
    • Mobile
    • Tech News
    • Blog
    • How-To Guides
    • AI & Software
    Facebook
    GeekBlog
    Home»Tech News»Unable to tame hydrogen leaks, NASA delays launch of Artemis II until March
    Tech News

    Unable to tame hydrogen leaks, NASA delays launch of Artemis II until March

    Michael ComaousBy Michael ComaousFebruary 3, 20262 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    Unable to tame hydrogen leaks, NASA delays launch of Artemis II until March
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Because of this, NASA engineers accept that a small amount of hydrogen will escape seals in the fueling line. Agency officials said in 2022 that the safe limit was a 4 percent concentration of hydrogen gas in the housing around the fueling connector. Hydrogen levels exceeded NASA’s safety limit multiple times during the practice countdown that ran from Monday into early Tuesday.

    This photo taken in 2019 shows the liquid hydrogen Tail Service Mast Umbilical undergoing tests inside the Vehicle Assembly Building. The connector plate is visible at the end of the arm in the center of the photo.

    Credit:
    NASA

    This photo taken in 2019 shows the liquid hydrogen Tail Service Mast Umbilical undergoing tests inside the Vehicle Assembly Building. The connector plate is visible at the end of the arm in the center of the photo.


    Credit:

    NASA

    “ Attempts to resolve the issue involved stopping the flow of liquid hydrogen into the core stage, allowing the interface to warm up for the seals to reseat, and adjusting the flow of the propellant,” NASA said in a statement.

    NASA appeared to get past the problem Monday evening and fully loaded the 322-foot-tall (98-meter) rocket with more than 750,000 gallons of propellant.

    With fueling complete, managers sent a closeout crew to the launch pad around 6:00 pm EST (23:00 UTC) to close the hatch to the Orion spacecraft sitting atop the SLS rocket. The closeout team will help the Artemis II astronauts into the Orion capsule on launch day, but the crew was not part of the practice countdown Monday night.

    The closeout crew took longer than anticipated to close and secure the hatch to the Orion spacecraft. A valve associated with Orion’s hatch pressurization inadvertently vented, according to NASA, requiring the closeout crew to retorque the valve. The launch team dealt with several other glitches, including audio dropouts on ground communication loops and camera problems believed to be caused by recent cold weather in Central Florida.

    Finally, with the closeout crew a safe distance away from the rocket, the launch team gave approval to begin the final 10 minutes of the countdown shortly after midnight Tuesday. The objective was to stop the countdown clock 33 seconds prior to launch, about the same time the rocket would take control of the countdown during a real launch attempt.

    Source: arstechnica.com

    Artemis delays hydrogen launch Leaks March NASA tame Unable
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Previous ArticleWaymo raises $16B to scale robotaxi fleet internationally
    Next Article Nick Goepper’s Starter Pack: Winter Olympics 2026
    Michael Comaous
    • Website

    Michael Comaous is a dedicated professional with a passion for technology, innovation, and creative problem-solving. Over the years, he has built experience across multiple industries, combining strategic thinking with hands-on expertise to deliver meaningful results. Michael is known for his curiosity, attention to detail, and ability to explain complex topics in a clear and approachable way. Whether he’s working on new projects, writing, or collaborating with others, he brings energy and a forward-thinking mindset to everything he does.

    Related Posts

    3 Mins Read

    Stop falling for scams when Norton’s antivirus software is 70% off right now

    4 Mins Read

    Acer Promo Codes and Deals: Save 40% on Bundles

    2 Mins Read

    Playing Wolfenstein 3D with one hand in 2026

    7 Mins Read

    Whoop has LeBron – now it wants your mom

    1 Min Read

    Sony temporarily suspends memory card sales due to shortages

    2 Mins Read

    Apple TV is now home to CrunchyRoll anime

    Top Posts

    The Mesh Router Placement Strategy That Finally Gave Me Full Home Coverage

    August 4, 2025826 Views

    Discord will require a face scan or ID for full access next month

    February 9, 2026766 Views

    Trade in your old phone and get up to $1,100 off a new iPhone 17 at AT&T – here’s how

    September 10, 2025332 Views
    Stay In Touch
    • Facebook

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    The Mesh Router Placement Strategy That Finally Gave Me Full Home Coverage

    August 4, 2025826 Views

    Discord will require a face scan or ID for full access next month

    February 9, 2026766 Views

    Trade in your old phone and get up to $1,100 off a new iPhone 17 at AT&T – here’s how

    September 10, 2025332 Views
    Our Picks

    Stop falling for scams when Norton’s antivirus software is 70% off right now

    March 28, 2026

    Acer Promo Codes and Deals: Save 40% on Bundles

    March 28, 2026

    Playing Wolfenstein 3D with one hand in 2026

    March 28, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook
    • About Us
    • Contact us
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    © 2026 GeekBlog

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.