Close Menu
GeekBlog

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Everyone Is Reading Instagram’s New Logo as “Instagzam,” and the Cursive Theory Is Only Half Right

    August 15, 2026

    Apple Just Put a Spyware Warning on the iPhone Lock Screen for the First Time

    August 15, 2026

    GameStop Will Pay You Full Price for a Busted Controller, but Only Until Saturday

    August 14, 2026
    Facebook X (Twitter) Instagram Threads
    GeekBlog
    • Home
    • Mobile
    • Tech News
    • Blog
    • How-To Guides
    • AI & Software
    Facebook
    GeekBlog
    Home»Tech News»NASA has a new problem to fix before the next Artemis II countdown test
    Tech News

    NASA has a new problem to fix before the next Artemis II countdown test

    Michael ComaousBy Michael ComaousFebruary 15, 20263 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    NASA has a new problem to fix before the next Artemis II countdown test
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    John Honeycutt, chair of NASA’s Artemis II mission management team, said the decision to relax the safety limit between Artemis I and Artemis II was grounded in test data.

    “The SLS program, they came up with a test campaign that actually looked at that cavity, the characteristics of the cavity, the purge in the cavity … and they introduced hydrogen to see when you could actually get it to ignite, and at 16 percent, you could not,” said Honeycutt, who served as NASA’s SLS program manager before moving to his new job.

    Hydrogen is explosive in high concentrations when mixed with air. This is what makes hydrogen a formidable rocket fuel. But it is also notoriously difficult to contain. Molecular hydrogen is the smallest molecule, meaning it can readily escape through leak paths, and poses a materials challenge for seals because liquified hydrogen is chilled to minus 423 degrees Fahrenheit (minus 253 degrees Celsius).

    So, it turns out NASA used the three-year interim between Artemis I and Artemis II to get comfortable with a more significant hydrogen leak, instead of fixing the leaks themselves. Isaacman said that will change before Artemis III, which likewise is probably at least three years away.

    “I will say near-conclusively for Artemis III, we will cryoproof the vehicle before it gets to the pad, and the propellant loading interfaces we are troubleshooting will be redesigned,” Isaacman wrote.

    Isaacman took over as NASA’s administrator in December, and has criticized the SLS program’s high cost—estimated by NASA’s inspector general at more than $2 billion per rocket—along with the launch vehicle’s torpid flight rate.

    NASA’s expenditures for the rocket’s ground systems at Kennedy Space Center are similarly enormous. NASA spent nearly $900 million on Artemis ground support infrastructure in 2024 alone. Much of the money went toward constructing a new launch platform for an upgraded version of the Space Launch System that may never fly.

    All of this makes each SLS rocket a golden egg, a bespoke specimen that must be treated with care because it is too expensive to replace. NASA and Boeing, the prime contractor for the SLS core stage, never built a full-size test model of the core stage. There’s currently no way to completely test the cryogenic interplay between the core stage and ground equipment until the fully assembled rocket is on the launch pad.

    Existing law requires NASA continue flying the SLS rocket through the Artemis V mission. Isaacman wrote that the Artemis architecture “will continue to evolve as we learn more and as industry capabilities mature.” In other words, NASA will incorporate newer, cheaper, reusable rockets into the Artemis program.

    The next series of launch opportunities for the Artemis II mission begin March 3. If the mission doesn’t lift off in March, NASA will need to roll the rocket back to the Vehicle Assembly Building to refresh its flight termination system. There are more launch dates available in April and May.

    “There is still a great deal of work ahead to prepare for this historic mission,” Isaacman wrote. “We will not launch unless we are ready and the safety of our astronauts will remain the highest priority. We will keep everyone informed as NASA prepares to return to the Moon.”

    Recommended for you:

    Congratulations, You (Almost) Made a MacBook
    Tech News·Feb 16, 2026

    Congratulations, You (Almost) Made a MacBook

    Recommended for you:

    Google is prepping a dedicated app to identify songs playing around you
    Tech News·Feb 16, 2026

    Google is prepping a dedicated app to identify songs playing around you

    Source: arstechnica.com

    NASA
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Previous ArticleHomeland Security reportedly sent hundreds of subpoenas seeking to unmask anti-ICE accounts
    Next Article Ring Kills Flock Safety Deal After Super Bowl Ad Uproar
    Michael Comaous
    • Website

    Michael Comaous is a dedicated professional with a passion for technology, innovation, and creative problem-solving. Over the years, he has built experience across multiple industries, combining strategic thinking with hands-on expertise to deliver meaningful results. Michael is known for his curiosity, attention to detail, and ability to explain complex topics in a clear and approachable way. Whether he’s working on new projects, writing, or collaborating with others, he brings energy and a forward-thinking mindset to everything he does.

    Related Posts

    7 Mins Read

    Everyone Is Reading Instagram’s New Logo as “Instagzam,” and the Cursive Theory Is Only Half Right

    7 Mins Read

    Apple Just Put a Spyware Warning on the iPhone Lock Screen for the First Time

    7 Mins Read

    GameStop Will Pay You Full Price for a Busted Controller, but Only Until Saturday

    7 Mins Read

    OpenAI Just Made GPT-5.6 Sol 14 Times Faster, and Nvidia Had Nothing to Do With It

    8 Mins Read

    SpaceX Built an Internet Constellation. Scientists Turned It Into an Atmosphere Scanner.

    7 Mins Read

    Google’s Own AI Lab Built a Workaround to Get Past Google’s AI Hiring Filter

    Top Posts

    MakuluLinux’s New AI-OS Wants to Run Your Whole Desktop, Not Just Answer Questions

    August 1, 20262 Views

    The New Siri Arrives This Fall, but a Lot of iPhones Are Not Invited

    August 7, 20261 Views

    AI Tokens Got 98% Cheaper. Corporate AI Bills Are Exploding Anyway

    July 31, 20261 Views
    Stay In Touch
    • Facebook

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Best Stores for Buying MP3 and Digital Music You Can Keep Forever (2026)

    August 2, 2025930 Views

    Discord will require a face scan or ID for full access next month

    February 9, 2026770 Views

    Trade in your old phone and get up to $1,100 off a new iPhone 17 at AT&T – here’s how

    September 10, 2025383 Views
    Our Picks

    Everyone Is Reading Instagram’s New Logo as “Instagzam,” and the Cursive Theory Is Only Half Right

    August 15, 2026

    Apple Just Put a Spyware Warning on the iPhone Lock Screen for the First Time

    August 15, 2026

    GameStop Will Pay You Full Price for a Busted Controller, but Only Until Saturday

    August 14, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook
    • About Us
    • Contact us
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    © 2026 GeekBlog

    Type above and press Enter to search. Press Esc to cancel.